| An approach to solve the problem of finding the distribution of project duration by using fuzzy the |
|
An approach to solve the problem of finding the distribution of project duration by using fuzzy theory. Nguyen Nhu Phong HCMC University of Technology The 9th Conference on Science and Technology HCMC University of Technology, 2005. Abstract The paper presents an approach to solve the problem of finding the distribution of project duration by using fuzzy theory. With the assumption that task times of projects are modelled by trapizoidal fuzzy number, the paper has offered an algorithm to find the possibilistic distribution of the project duration so as to estimate the expected value, the minimum value and the maximum value of the project duration, and to evaluate the possibility to finish the project before a specific time in order to make decisions related to the time aspect of project scheduling.
|