Home Page RESOURCE PLANNING MRP II Master Production Schedule Stability Under Conditions of Finite Capacity
Master Production Schedule Stability Under Conditions of Finite Capacity

Master Production Schedule Stability Under Conditions of Finite Capacity

Edmund W. Schuster†

The Data Center

Massachusetts Institute of Technology

Cambridge, MA 02139

23 Valencia Drive

Nashua, NH 03062

603.759.5786 (c)

Địa chỉ email này đã được bảo vệ từ spam bots, bạn cần kích hoạt Javascript để xem nó.

Chatchai Unahabhokha

University of Cambridge

Cambridge CB2 1TN, UK

Stuart J. Allen

Professor Emeritus

Penn State University

MRPII 01

 

ABSTRACT

In this article, we propose a new way to improve master production schedule (MPS) stability under conditions of finite capacity.

The purpose is to optimize product availability and customer service for typical situations encountered in the consumer goods industry.

Using a comprehensive MPS model, we conduct a simulation study with experimental design to identify factors having a significant influence on MPS stability.

Then we perform sensitivity analysis on select factors that hold the greatest promise for improvement by employing a simple predictive equation. Finally, we test a different way to plan safety stocks and report the results.

In general, elimination of forecast bias and choice of safety stock method both are particularly important for improving MPS stability and ultimately customer service.

 
  • thiet ke noi that chung cu

  • thiet ke noi that chung cu

  • thiet ke noi that chung cu

  • thiet ke noi that chung cu

ABOUT US

ADMIN


GOOD BROWSERS

 
   

STATISTIC

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday193
mod_vvisit_counterYesterday689
mod_vvisit_counterThis week4285
mod_vvisit_counterThis month882
mod_vvisit_counterTotal1173853
Hiện có 31 khách Trực tuyến