Home Page RESOURCE PLANNING MRP II Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system.
Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system.

Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system.

MRPII 88

A. MOLINDER²

This paper reports on a simulation study of an MRP system aŒected by stochastic demand and stochastic lead times. Experiments are conducted to assess the impact of three data sets: the amount of lead time variability, the amount of demand variability, and the in¯ uence of the stockout cost/inventory holding cost ratio.

Lot-sizes, safety stocks and lead times are optimized using simulated annealing. The eŒects of either using safety stocks or safety lead times are compared to each other with the purpose of ® nding the best method for protection against uncertainties in lead time and demand.

 

 
  • thiet ke noi that chung cu

  • thiet ke noi that chung cu

  • thiet ke noi that chung cu

  • thiet ke noi that chung cu

ABOUT US

ADMIN


GOOD BROWSERS

 
   

STATISTIC

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday293
mod_vvisit_counterYesterday492
mod_vvisit_counterThis week3242
mod_vvisit_counterThis month293
mod_vvisit_counterTotal1173264
Hiện có 75 khách Trực tuyến