Home Page RESOURCE PLANNING MRP II The capacity planning problem in make-to-order enterprises
The capacity planning problem in make-to-order enterprises

The capacity planning problem in make-to-order enterprises.

MRPII 60

Chin-ShengChenb,SiddharthMestryb,PurushothamanDamodarana,∗,ChaoWangb aDepartmentofIndustrialandSystemsEngineering,NorthernIllinoisUniversity,DeKalb,IL60115,UnitedStates bDepartmentofIndustrialandSystemsEngineering,FloridaInternationalUniversity,Miami,FL33174,UnitedStates

A R T I C L E I N F O

Article history: Received2October2007 Accepted15July2009

KEYWORDS:

Capacity planning; Make-to-order; Product mix; Production planning; Operations management

A B S T R A C T

Thispaperaddressestheshort-termcapacityplanningprobleminamake-to-order(MTO) operationenvironment. Amathematicalmodelispresentedtoaidanoperationsmanager in an MTO environment to select a set of potential customer orders to maximize the operational profit such that all the selected orders are fulfilled by their deadline. With a given capacity limit on each source for each resource type, solving this model leads to an optimal capacity plan as required for the selected orders over a given (finite) planning horizon. The proposed model considers regular time, overtime, and outsourcing as the sourcesforeachresourcetype. ByapplyingthismodeltoasmallMTOoperation,thispaper demonstrates a contrast between maximal capacity utilization and optimal operational profit.

 

 

 
  • thiet ke noi that chung cu

  • thiet ke noi that chung cu

  • thiet ke noi that chung cu

  • thiet ke noi that chung cu

ABOUT US

ADMIN


GOOD BROWSERS

 
   

STATISTIC

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday96
mod_vvisit_counterYesterday689
mod_vvisit_counterThis week4188
mod_vvisit_counterThis month785
mod_vvisit_counterTotal1173756
Hiện có 53 khách Trực tuyến