Development of finite capacity material requirement planning system for assembly operations

TEERADEJ WUTTIPORNPUN and PISAL YENRADEE

MRPII 43

 

Abstract.

A conventional material requirement planning (MRP) logic considers in?nite capacity of machines. A planner must manually solve capacity problems (if any) after the material requirement plan has been generated.

This paper tries to alleviate the capacity problems by developing a ?nite capacity material requirement planning (FCMRP) system for assembly operations.

The FCMRP system is capable of automatically allocating some jobs from one machine to another and adjusting timing of the jobs considering a ?nite available time of all machines.

The FCMRP system has been tested using real data from a steering-wheel factory. E?ects of options – namely, scheduling, rearranging and adjusting options in the FCMRP system on the performance measures – are statistically analysed.

The FCMRP system can reduce required overtime if the jobs are allowed to be completed earlier than the due dates. The required overtime can be further reduced if the jobs are allowed to be completed later than the due dates.

 

Keywords

Material requirement planning, Finite capacity, theory of constraints, assembly operations, application in industry

 

 
  • thiet ke noi that chung cu

  • thiet ke noi that chung cu

  • thiet ke noi that chung cu

  • thiet ke noi that chung cu

ABOUT US

ADMIN


GOOD BROWSERS

 
   

STATISTIC

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterToday348
mod_vvisit_counterYesterday492
mod_vvisit_counterThis week3297
mod_vvisit_counterThis month348
mod_vvisit_counterTotal1173319
Hiện có 22 khách Trực tuyến